One
classroom admeasuring 1000 sq. ft. is being built on the second
floor of Smt. S.I.Patel Ipcowala building. The work is partly
funded by the ex-students of commerce college. The donation
was received by Prin. Shri H.C.Chokshi. The work is expected
to be over by August 2004.
A laboratory for the College of Education is being constructed
on the second floor of the Smt. S.I.Patel Ipcowala building.
The work is expected to be over by August 2004.
A 3000 sq. ft. large library hall is being constructed on the
second floor of the Smt. S.I.Patel Ipcowala Building. The library
is intended to be used by the students of the Commerce College
and the College of Education. The construction work shall be
over by August 2004. We invite generous contributions for the
library.
Repair and maintenance: Work is under way at various locations.
You may convey your requirements by the feedback.
Wire fencing along all the boundaries is in progress. The work
is expected to be over by end-July 2004.
|